Itinerary for a new build.
Note: This is only an estimation as product prices are changing all the time. dated 12 09 07. please ask for a quotation in writing)
TIMBER
Decks ( 6 mm top quality Ply)
Planking, Transom and 4 fitted Knees (African or Brazilian Mahogany) Thwart, Side Seats and Centre Case (African or Brazilian Mahogany)
Timbers or Ribs (French oak)
Deck beams and Perlings (Sitka Spruce or Western red Cedar) floor boards (9mm Ply)
FINS
Carbon fibre re-enforced rudder (cedar core)
Ballast Keel (Bronze)
Centre plate (Bronze)
PAINTS AND FIXINGS
Hull 3 coats WRA 200, 4 coats Sp high build primer, 1 coat colour primer, 2 top coats.
Inside, 4 coats WRA 200 (under decks behind all frames), 6 coats Polyurethane varnish.
Decks, Transom, Stem and Spars, 4 coats WRA 200, 6 coats 2 pack Polyurethane varnish.
Products (brushes rollers tape etc)
Copper fastenings and Glues
LABOUR
Build bare hullBuild Floor Boards, Jib Pole, Bow Sprit, Rudder, Paddle, Fit Bronze Keel
Paint, Seal and Varnish hull and all parts as described above
Fittings
Air Bags (make to be agreed)
Pulleys, Cleats, Jib roller reefing and blocks (good quality, to be agreed)
Toe Straps (webbing)
Halyards and Sheets
Paints and Fixings
Hull 3 coats WRA 200, 4 coats Sp high build primer, 1 coat colour primer, 2top coats.
Inside, 4 coats WRA 200 (under decks behind all frames), 6 coats 2 pack Polyurethane varnish.
Decks, Transom, Stem and Spars, 4 coats WRA 200, 6 coats 2 pack Polyurethane varnish.
Products (brushes rollers tape etc)
Copper fastenings and Glues
Extras can include :
Trailer with Piggy back Launching Trolley
Full size cover, over Transom and top plank